Skip to main content
Start a project
TechGeek UK
Spectra

Spectra workflow

Keep the right detail moving with the job.

A sign job passes through different people, versions and decisions. Use the seven-stage Spectra sample as a practical way to identify what each handoff needs, who owns it and what should stop work until a question is resolved.

Product programme · explore the sample; application availability by discussion

Spectra’s public website offers guides, browser-local tools and a fictional sign-job demonstration. Those resources do not establish customer SaaS availability, live integrations, migration services or production outcomes.

Conceptual workflow

Follow the work through Spectra.

Enquiry

Capture what the customer wants, the relevant site or vehicle context, the desired timing and the unanswered questions.

Start from the working question

What should the next person receive?

The next person rarely needs the entire history in an inbox. They need the current brief, the relevant source information, the approved version and the unresolved dependency that affects their work. Keep those distinctions visible when mapping a sign-business process.

The sequence below explains Spectra’s public product direction. It is an evaluation framework using fictional examples; it does not assert that a production system will execute every stage or connect to a named supplier.

Enquiry to invoice review

Seven stages. One recognisable job.

Use the same fictional job reference throughout the walkthrough. At every step, ask which information is authoritative, who can approve the next move and where a change is recorded.

  1. Enquiry

    Capture what the customer wants, the relevant site or vehicle context, the desired timing and the unanswered questions.

  2. Survey

    Associate measurements, photographs, access notes and unknowns with their source. A missing fact remains an owned question.

  3. Quote

    Retain the quantities, material and labour assumptions, exclusions, revision and accepted commercial scope.

  4. Proof

    Identify the artwork version and specification presented for approval. Keep requested changes separate from an approved instruction.

  5. Make

    Prepare the workshop’s current instruction with materials, quantities, relevant checks and any hold that prevents release.

  6. Install

    Carry the job details, access arrangements, dependencies and completion evidence into the fitting handover.

  7. Invoice review

    Reconcile completed work and approved variations with the accepted scope before the commercial close-out.

Where the workflow is tested

A version change should have a visible consequence.

Consider a fictional fascia job whose proof changes after a production slot has been discussed. The team needs to know whether the new proof affects dimensions, materials, manufacture or fitting. It also needs to know what has actually been approved.

The appropriate response is an owned review, not an assumption that the latest attachment is automatically the production instruction. Map the decision, the people affected and the state that prevents work from continuing with superseded information.

A version change should have a visible consequence.
Change or gapQuestion for the handoff
Artwork revisionWhich version is approved and what has changed?
Unconfirmed site factWho will obtain it and which activity remains on hold?
Material substitutionWho reviews its effect on scope, proof and production?
Installation exceptionWho accepts the next action and how is completion recorded?
Commercial variationWhere is the approved change linked to the job?

Prepare a useful handover

Keep the instruction short enough to use.

A handover record should identify the job, the current version, the source of the instruction, the responsible people and the exceptions that affect the receiving team. It should point to the relevant detail rather than replace specialist assessment or duplicate every working document.

Spectra’s public survey and production-to-install tools can help structure the conversation. Their outputs are preparation aids. Review measurements, scope, site conditions and any specialist requirements through the people responsible before issuing work.

Learn from the delivered work

Keep assumptions and actuals distinguishable.

When the job is complete, compare the accepted scope with the delivered work and approved variations. If you review job cost, retain the method and inputs so that the difference can be explained.

That record can inform the next estimate or process discussion. It does not prove that a software programme has improved profit or reduced lead time. A measured improvement would need a defined baseline, comparable work and reliable operational data.

Questions before the next step

A clearer view of Spectra.

Why keep the same job reference through the demonstration?

It lets the team trace whether the enquiry, approved scope, current proof, handover and commercial close-out remain recognisable as one job rather than separate screens.

Does this guide provide installation or safety instructions?

No. It describes information and ownership across an operating workflow. Technical, structural, electrical, access and safety decisions require the appropriate people and current job-specific evidence.

Can the sample workflow send quotes or invoices?

The public demonstration uses fictional records. Do not treat a sample quote, invoice or button as an authorised external action or a connection to an accounting provider.

Make the next conversation useful

Start with the work.
Explore the fit.

Bring your workflow, the people involved and the decisions you need to make.